There is a common saying that we have all heard many times in our lives. It says, “Change is inevitable,” and it is always for good. The same goes for the construction industry as well. With the change in technology and working methods, there are multiple benefits related to it. The idea entirely changed the traditional terms and reinforced that idea.
Regarding the excellent services, BIM services have significantly developed and marked advancement in the AEC industries regarding their professional outcomes and processes.
Soon, with the understanding of the BIM process in the market, it has proved to be a game-changer for MEP services. It helped in the delivery of the work that has MEP layouts, MEP coordination, and MEP coordination drawings with it.
While discussing the construction industry, MEP or building services play a crucial role. The complete functionality of the building is dependent on its proper MEP integration and its services. It continues to install a fire-fighting protection process in the entire building structure.
The work of MEP coordination is to ensure that the services and the layout of the designs do not have any clashes and conflicts. Also, it should not conflict with architectural and structural disciplines and conditions.
So, it is the engineer’s core responsibility to ensure that all conflicts and errors are avoided at the initial stage. Further, the design layout should share information about the ducts, piping, and raceway systems. To be precise, the construction at the site will start only after the errors and clashes are eliminated from the drawings and designs.
The coordination process is time-consuming and pertains to the large MEP project. The exact position of every project area and MEP components are pre-defined and checked further to ensure no clashes and conflicts. It undergoes a procedure and proves to have potential for preventing the error. Also, the team reviews the error at any moment, a back-and-forth process of checks and changes between services and their disciplines.
The process of MEP coordination needs to be in sync to be successful, along with all necessary trade professionals and requirements. In general, the work of MEP requires several drawings and layouts, and it has to be done correctly. Once the planning stage work starts, the team gradually works on functional clashes and rectifies them so that the conclusion of the work is effective.
Related Blog:
MEP Coordination: Explanation And Process
Well, all the discussion we have had till now was the traditional method used during the MEP coordination process. But with the integration of BIM technology and its evolution, things have taken a complete 360-degree turn and have brought some much-needed respite. Let us know how it is.
Integrating the BIM process helped the AEC professionals receive a detailed 3D intelligent project model with complete details planned methodically. It presents the digital view of the building structure before its construction. Also, based on the design, the team can make decisions and evaluate the process for the project. The integrated 3D technology details the project’s overall details with the use of 4D BIM Services and other stages.
Hence, with MEP BIM Services, coordination has become more reasonable, relatable, and collaborative. It is the way that helps accessible communication and continuous approach in getting the work done. Also, it helps to install the first level of fittings and fixation in the building modeled. Services, clashes, and conflicts can be included in the error-free and clash-free model. It is possible only with the help of the layout prepared for the model. These layouts are the architectural and structural designs for the model.
The project work further continues once the model creation is complete. Later, the challenges can be identified and determined to work upon. Also, reviewing the model is easy with the help of a proper walkthrough and using necessary software like Navisworks and clash-detection software. Not only this, but this software helps them highlight the clashes between services and disciplines. The respective errors are eliminated during the MEP coordination stage.
Over the years, BIM solutions have proven effective in MEP coordination and improved many clashes in the initial stage of the project. Taking the article further lets us check its benefits, ultimately leading to lower costs.
Qualitative Improvisation
The integration of BIM technology improvises the overall quality of the project. With the use of integrated techniques and ideology, the model’s outcome is as expected by the clients and within the trade practices. The MEP Coordination project work is successful with the help of scalable and relatable BIM integration, which is known as the construction industry’s future.
Speeding Work
Once the project sketch is designed and drafted, the team knows what and how to take the design further. The software helps take a virtual tour of the model and, based on that, decide what software needs to be used to ensure that the work is speeding up. Hence, BIM tools, trades, and practices help speed up the project’s work and meet the deadlines to complete the project.
Lower Cost
The cost of the entire project is reduced to a great extent. It is only with the help of integrating BIM tools and services. BIM services are the core need for every MEP coordination process. With the 5D BIM technique, the project cost can be known, all within budget and at a lower cost valuation.
Clash-free MEP Designs
The final model of the building structure needs to be delivered error-free and clash-free. It is the core requirement of MEP designs. Hence, the professionals use the clash-detection software before submitting the final design of the building model and structure.
Collaborative Visualisation
The project is incomplete unless it has a collaborative approach to it. The BIM engineers and other team members collaboratively work on the project and, with a collaborative process, deliver the project with proper visualization. It is the process without which the project is incomplete and has no idea where the outcome will reach. Hence, BIM integration helps visualize the project in a significant way.
Increased Collaboration
The collaboration between the parties and project personnel is increased to a great extent when it comes to delivering the project that is within the market practice. The approach of BIM with integrated MEP coordination has proved its competency, and thus the collaboration and communication between the parties have increased to a great extent.
Recent Blog:
Improve MEP Coordination In Modular Construction Using BIM Methodology
Over to You
The blog delivers the critical idea and importance of BIM services that have helped MEP coordination projects complete quickly and accurately. Consider checking the services and undertaking the project details with pertinent information and data.